GTAA – PIER F / HAMMERHEAD (Terminal 1)

PCL was the construction manager for this project in joint venture with AECON.
The new international Pier F is home to 25 gates and increases the passenger capacity of the airport by seven million passengers.
Guild Electric Limited provided the installation of all electrical power systems, including:

• lighting systems,
• low voltage lighting control,
• high and low voltage distribution,
• lightning protection,
• apron lighting systems,
• gate lighting and
• power systems.

 
     
   
 

_______________________________________________________________________________________________________________________________________________________________________

Copyright © 2011 Guild Electric Ltd.   LEGAL   CONTACT US